Areas of Operation: Mining
* Click on the photos to enlarge
-
Votorantim Metais Zinco
Usicon C & W – Vazante – MG
Contract job performed ou 3 stages:
• Earth draimage woks • Usicon C • Usicon W
Concret V. 15.792 m3 -
Votorantim Metais Níquel – Niquelândia - GO
Britagem Primária – CNT para 20.400 ton/ano – Niquelândia – GO
Highly enlargement Dam with spiller enlargement with gallery and channel
Concret Volume 5,185 m3 -
Gerdau
Experimental Plant – Miguel Burnier – Gerdau Acominas – MG
Turn-key job including earth works, drainage, buildings, equipment bases and paving
Concrete Volume – 4,850 m3 -
VALE
Rolling Press Unit – Vitoria – ES
Turn-key job
Construction area – 5,400 m2
Concrete Volume – 3,850 m3 -
Votorantim Metais Níquel – Niquelândia - GO
23.000 t/y – Expansion Plan
9º. Reduction furnace installation including others expansion areas
Concrete Volume 3,506m3 -
Votorantim Metais Níquel – Niquelândia - GO
20.400 t/y - Expansion Plan
Reduction furnace installation including others expansion areas
Concrete Volume 3,200m3 -
Votorantim Metais Zinco
Underground Water Iortake Canal - Vazante – MG
3,5 Km of extension and 0,1 % inclination
Concrete V. 2.703 m3 -
Votorantim Metais Zinco
Autoclaves – Três Marias – MG
Concrete V. 2.340 m3 -
Votorantim Metais Zinco
Aroeira Dam – Vazante – MG
New rejects dam
Concrete V. 1.967 m3 -
Votorantim Metais Zinco
Morro Agudo Plant – Expansion – Paracatu – MG
Concrete V. 1.696 m3 -
Votorantim Metais Níquel – Niquelândia - GO
Primary Stone Crusher – CNT 20,400 t/y
Concrete Volume – 1,240 m3 -
TABOCA MINING
Primary Ore Crusher – Presidente Figueiredo
Contract job developed on Amazon jungle
Concrete Volume – 1,010 m3.