Areas of Operation: Mining

* Click on the photos to enlarge

  1. Votorantim Metais Zinco

    Votorantim Metais Zinco

    Usicon C & W – Vazante – MG
    Contract job performed ou 3 stages:
    • Earth draimage woks • Usicon C • Usicon W
    Concret V. 15.792 m3

  2. Britagem Primária – CNT para 20.400 ton/ano – Niquelândia – GO Britagem Primária – CNT para 20.400 ton/ano – Niquelândia – GO

    Votorantim Metais Níquel – Niquelândia - GO

    Britagem Primária – CNT para 20.400 ton/ano – Niquelândia – GO
    Highly enlargement Dam with spiller enlargement with gallery and channel
    Concret Volume 5,185 m3

  3. Gerdau Gerdau

    Gerdau

    Experimental Plant – Miguel Burnier – Gerdau Acominas – MG
    Turn-key job including earth works, drainage, buildings, equipment bases and paving
    Concrete Volume – 4,850 m3

  4. VALE

    VALE

    Rolling Press Unit – Vitoria – ES
    Turn-key job
    Construction area – 5,400 m2
    Concrete Volume – 3,850 m3

  5. Votorantim Metais Níquel – Niquelândia - GO

    Votorantim Metais Níquel – Niquelândia - GO

    23.000 t/y – Expansion Plan
    9º. Reduction furnace installation including others expansion areas
    Concrete Volume 3,506m3

  6. Votorantim Metais Níquel – Niquelândia - GO

    Votorantim Metais Níquel – Niquelândia - GO

    20.400 t/y - Expansion Plan
    Reduction furnace installation including others expansion areas
    Concrete Volume 3,200m3

  7. Votorantim Metais Zinco

    Votorantim Metais Zinco

    Underground Water Iortake Canal - Vazante – MG
    3,5 Km of extension and 0,1 % inclination
    Concrete V. 2.703 m3

  8. Votorantim Metais Zinco Votorantim Metais Zinco

    Votorantim Metais Zinco

    Autoclaves – Três Marias – MG
    Concrete V. 2.340 m3

  9. Votorantim Metais Zinco

    Votorantim Metais Zinco

    Aroeira Dam – Vazante – MG
    New rejects dam
    Concrete V. 1.967 m3

  10. Votorantim Metais Zinco

    Votorantim Metais Zinco

    Morro Agudo Plant – Expansion – Paracatu – MG
    Concrete V. 1.696 m3

  11. Votorantim Metais Níquel – Niquelândia - GO

    Votorantim Metais Níquel – Niquelândia - GO

    Primary Stone Crusher – CNT 20,400 t/y
    Concrete Volume – 1,240 m3

  12. Mineração Taboca

    TABOCA MINING

    Primary Ore Crusher – Presidente Figueiredo
    Contract job developed on Amazon jungle
    Concrete Volume – 1,010 m3.