Paulino Patrus Engenharia

Obras

Areas of Operation: Steel Production

* Click on the photos to enlarge

  1. Votorantim Siderurgia

    Votorantim Siderurgia

    Shredder – SBM – Barra Mansa – RJ
    Pig Iron Shredder Foundation With Electrical and drive rooms with area of 800m2
    Concrete 1.800m3

  2. V&M do Brasil

    V&M do Brasil

    Rotary Turnace Shop RK – 3000.000
    Concrete 1.800m3

  3. Votorantim Siderurgia

    Votorantim Siderurgia

    Mill Wire Mill - SBM – Barra Mansa – RJ
    Concrete 1.732m3

  4. Votorantim Siderurgia Votorantim Siderurgia

    Votorantim Siderurgia

    Continuous Casting Bilding – SBM – Barra Mansa – RJ
    Steel Mill Enlargement Building With 2400 m2 (area) and 28 m (Height)
    Concrete 1.198 m3

  5. ArcelorMittal

    ArcelorMittal

    Acesita Pcant – Steel Mill II Expansion – Timóteo - MG
    Concerming Shop Expansion, Mill Plant Relocation VODII
    Concrete 1.646m3

  6. V&M do Brasil

    V&M do Brasil

    Rotary Furnace – Contagem – MG
    Ø 32 m Rotary Turnace botlon
    Concrete 1600m3

  7. Votorantim Siderurgia

    Votorantim Siderurgia

    Mesh Fabric – SBM – Barra Mansa – RJ
    Concrete 1.198m3

  8. ArcelorMittal

    ArcelorMittal

    Steel Mill Dust Removal - Belgo – Juiz de Fora – MG
    Concrete 1.141
    Foundation pile – 3.489m3

  9. Votorantim Siderurgia

    Votorantim Siderurgia

    Demag Mill Revamping – SBM – Barra Mansar – RJ
    Concrete 1.132m3

  10. Votorantim Siderurgia

    Votorantim Siderurgia

    Steel Mill dust removal building
    With 757m3 of concrete

  11. ArcelorMittal

    ArcelorMittal

    Piping Shop – Acesita – Timóteo – MG
    Concrete – 716m3

  12. Votorantim Siderurgia

    Votorantim Siderurgia

    Events Convenience Center
    Constructed in 75 days
    Area 3.000m2
    Concrete 580 m3

  13. ArcelorMittal

    ArcelorMittal

    Ligweight wire line - Belgo – Cariacica – ES
    Performed Will Stop and go system
    Concrete 516m3

  14. ArcelorMittal

    ArcelorMittal

    Electrial & Hydraulic Roons - Belgo – Vitória – ES
    Ligh Frequency Furnace
    Performed With stop and go system
    Concrete 429m3

  15. ArcelorMittal

    ArcelorMittal

    5º Continuous Casting Shaft - Belgo – Juiz de Fora – MG
    Job Constrution performed with continuous casting and cooling bed
    Concrete 231m3